Finish Assembly
 Fig. 42
- 27. Install spark plugs.
- 28. Install intake manifolds using new gaskets (clean the gasket
surface).
- 29. Insert blower housing with generator.
- 30. Install cylinder shrouds.
- 31. Install fuel pump shield.
- 32. Fasten lower air ducts (Export heater).
- 33. Install cylinder end shrouds.
- 34. Attach oil lines to bypass oil filter and oil- pressure switch,
check for leakage.
- 35. Fasten generator strap, spin generator shaft to ensure that blower
impeller is not binding.
- 36. Install V-belt.
- 37. Connect cable to Terminal I connecting coil and distributor.
- 38. Install carburetors, throttle linkage, and fuel line.
- 39. Install oil filler.
- 40. Install air cleaners.
- 41. Connect ignition leads.
- 42. Install exhaust muffler, connecting with heat exchangers.
- 43. Fill engine oil, run engine briefly and re- check oil level,
replenish if necessary.
|